The National Highways Authority of India (NHAI) achieved the breakthrough in the construction of 2.79 km left hand side twin-tube tunnel under the Basanwahi-Marangpuri Six Lane Greenfield Road Project (Raipur-Visakhapatnam Economic Corridor) Package CG-3 on October 4, 2025.
This content is restricted.